- Piled Foundations for extension in Altrincham
- Completed in four working days
- Structural Engineers Calculations Provided
- Fully Insured, Qualified, Experienced Workforce
Our client contacted us regarding some foundation works at their property for a rear single storey extension. First of all, we arranged to visit site to discuss the works with the client. We agreed that a piling scheme would best suit this project. A price was agreed and we were able to start the works the following week.
We began by excavating the footings for the new extension. We installed our piling scheme, according to our structural engineers design which included top driven steel cased piles and mesh. Once completed, we arranged for the building inspector to visit site and assess the works. He passed the works and as a result we were able to concrete the next morning.
Overall, it took a total of four working days to complete the piling foundations in Altrincham, including all excavation, piling and concreting. On completion, we provided our client with copies of the structural engineers calculations (design) and our piling log detailing the depths of each pile. We also provided our insurance/warranty information.
In conclusion, our client was pleased with the high standards of our works and our efficiency.
Below are some images showing the different stages throughout the works;